Skip to main content

1. Anticipate the details when opening / adapting a site

When you’re constructing or adapting a location, critical details in facility construction and build-out can mean the difference between launching an efficient facility on time or encountering costly delays and operating problems. The choices you make during this phase directly impacts your ability to run things smoothly once the lab is ready—and can also affect the facility’s safety and regulatory compliance.

2. Streamline the supply chain

Having a streamlined facilities procurement system is advantageous whether your operations are concentrated in a single market or across regions. Working with an established network of preferred suppliers can streamline access to crucial supplies, shorten lead times and reduce costs.

5. Improve efficiency with tech tools

When you have accurate data, layered with the right analytics and robust guidance from a trusted CRE partner, you can make smarter, faster, strategic decisions that optimize your real estate footprint, realize cost-savings and drive operational efficiencies.