A large government body leveraged JLL smart building solutions to achieve impressive annual energy savings, optimize building performance, and meet stringent data security requirements.
A large government body saves $3.5M in annualized energy costs
The client embarked on a smart building program across all its sites, with a goal of a 10% utility cost reduction target. JLL secured most of the contracts available through a multi-year contract for implementation and continuous monitoring, fault detection and diagnostics (AFDD). This represented a significant deployment that involved deploying the technology at various sites throughout the country and collaborating with both client and third-party facilities management teams.
Solution
The client sought to optimize the performance of their building portfolio and enhance the utilization of their smart metering systems. To achieve this goal, they installed IntelliCommand at 53 sites totaling over 16 million square feet, with potential future phases under consideration.