A large government body leveraged JLL smart building solutions to achieve impressive annual energy savings, optimize building performance, and meet stringent data security requirements.
Client story
A large government body saves $3.5M in annualized energy costs
Categories:
The client embarked on a smart building program across all its sites, with a goal of a 10% utility cost reduction target. JLL secured most of the contracts available through a multi-year contract for implementation and continuous monitoring, fault detection and diagnostics (AFDD). This represented a significant deployment that involved deploying the technology at various sites throughout the country and collaborating with both client and third-party facilities management teams.
Key elements of the solution include:
- Integration with dozens of unique building management systems and smart meters, while also addressing the client's stringent data security requirements.
- Event-specific, automated savings calculations to identify the highest priority tasks for completion and access to operational insights into building and space conditions.
- Creation of a platform for future smart building system integrations, including smart lighting and occupancy systems.
- The solution was delivered under a fixed price structure for all sites based on building size.
Results
The implementation of the IntelliCommand system produced significant results:
- >$3,500,000 in annualized energy savings; <2 year ROI
- >20,000 unique assets monitored in real time
- Over 150 unique IntelliCommand client users
- Multiple contract extensions awarded to JLL