Proposed plan will reduce energy use between 6 and 28 percent

Coca-Cola
International

Challenge

  • Identify solutions to reduce energy use and utility costs across nine plants in three countries

Solution

  • Conduct site audits for each property
  • Provide high-level solutions design and business case analysis of improvement measures including:
    • Improved steam and glycol piping insulation
    • Converting an 8-megawatt generator plant into a tri-gen plant
    • Recover methane gas from a wastewater treatment facility for heating
    • Retrofit chiller from air-cool to water-cool

Results

  • Our recommendations will reduce energy use between 6 and 28 percent, with corresponding savings of over $4 million
  • Estimated ROI at each plant is from 2-3½ years